Roberts Library Construction 2024-2025
Exterior - New Entrance
Search this Guide
Search
Roberts Library Construction 2024-2025: Exterior - New Entrance
Home
Timelines
Design Concepts
Construction Photos
Toggle Dropdown
2nd floor Progress
Exterior - New Entrance
History of the Library Building
General Exterior Views
East window removed
Removing materials from the 2nd floor
Old light fixtures going out
Side facing Sequoyah Hall before
Work on Stairwell
Stairwell at the new entrance location
Wall removed
Start of stair removal
First cut on the stairs
Almost all removed
All stairs removed
Windows removed
Plastic over the stairwell and the new window location
Work on the Entrance Foundation
Digging up the sidewalk
Sidewalk removed and ready dig
Setting up to drill
Form is ready for fill
Visiting supervisor
Beams being moved in for new entrance
Connecting to the building
<<
Previous:
2nd floor Progress
Next:
History of the Library Building >>